【レポートの概要(一部)】
PART 01: Executive summary
• Highlights
PART 02: Scope of the report
• Market overview
• Top-vendor offerings
PART 03: Market research methodology
• Research methodology
• Economic indicators
PART 04: Introduction
• Key market highlights
PART 05: Market landscape
• Market overview
• Market size and forecast
• Five forces analysis
PART 06: Market segmentation by electrical construction
• UPS
• Rack PDU
• Energy storage
• Generators
• Transfer switches and switchgears
• Others
PART 07: Market segmentation by mechanical construction
• Cooling solutions
• Racks
• Other
PART 08: Market segmentation by general construction
PART 09: Market segmentation by tier type
• Tier 1
• Tier 2
• Tier 3
• Tier 4
PART 10: Geographical segmentation
• Americas
• EMEA
• APAC
PART 11: Market drivers
PART 12: Impact of drivers
PART 13: Market challenges
PART 14: Impact of drivers and challenges
PART 15: Market trends
PART 16: Vendor landscape
• Other prominent vendors
PART 17: Appendix
• List of abbreviations
PART 18: Explore Technavio
[List of Exhibits]
Exhibit 01: Product offerings
Exhibit 02: Growth of global Internet user base 2011-2015 (billions)
Exhibit 03: Data growth statistics
Exhibit 04: Data center average rack power density 2015 and 2020 (kW per rack)
Exhibit 05: Data center construction cost analysis
Exhibit 06: Evolution of construction, components, and techniques in modern data center projects
Exhibit 07: Global data center construction market 2015-2020 ($ billions)
Exhibit 08: Global new data center construction market 2015-2020 ($ billions)
Exhibit 09: Global data center renovation market 2015-2020 ($ billions)
Exhibit 10: Global new data center construction and renovation by revenue 2015-2020 ($ billions)
Exhibit 11: Five forces analysis
Exhibit 12: Electrical infrastructure involved in data center construction
Exhibit 13: Global data center construction market by electrical construction segment 2015-2020 ($ billions)
Exhibit 14: Global data center construction market by electrical construction segment 2015-2020 ($ billions)
Exhibit 15: Global data center construction market by UPS segment 2015-2020 ($ billions)
Exhibit 16: Global data center rack PDU market 2015-2020 ($ billions)
Exhibit 17: Global data center construction market by energy storage segment 2015-2020 ($ billions)
Exhibit 18: Global data center construction market by generators segment 2015-2020 ($ billions)
Exhibit 19: Global data center construction market by transfer switches and switchgears segment 2015-2020 ($ billions)
Exhibit 20: Global data center construction market by other electrical infrastructure segment 2015-2020 ($ billions)
Exhibit 21: Mechanical infrastructure
Exhibit 22: Global data center construction market by mechanical construction segment 2015-2020 ($ billions)
Exhibit 23: Mechanical infrastructure market for data center construction 2015-2020 ($ billions)
Exhibit 24: Global data center construction market by cooling solutions segment 2015-2020 ($ billions)
Exhibit 25: Global data center construction market by racks segment 2015-2020 ($ billions)
Exhibit 26: Global data center construction market by other mechanical infrastructure segment 2015-2020 ($ billions)
Exhibit 27: Work involved in general construction
Exhibit 28: Global data center construction market by general construction segment 2015-2020 ($ billions)
Exhibit 29: Tier system for data centers
Exhibit 30: Global Tier 1 and Tier 2 data center construction market 2015-2020 ($ billions)
Exhibit 31: Global Tier 3 data center construction market 2015-2020 ($ billions)
Exhibit 32: Global Tier 4 data center construction market 2015-2020 ($ billions)
Exhibit 33: Geographical segmentation 2015
Exhibit 34: Global data center construction market in Americas 2015-2020 ($ billions)
Exhibit 35: Global data center construction market in EMEA 2015-2020 ($ billions)
Exhibit 36: Global data center construction market in APAC 2015-2020 ($ billions)
Exhibit 37: Impact of drivers
Exhibit 38: Power consumption in data centers by infrastructure
Exhibit 39: Impact of drivers and challenges
【レポート販売概要】
■ タイトル:データセンター建設の世界市場2016-2020■ 英文:Global Data Center Construction Market 2016-2020
■ 発行日:2016年9月7日
■ 調査会社:Technavio
■ 商品コード:IRTNTR10488
■ 調査対象地域:グローバル
- 水産養殖向け水処理技術の世界市場2016-2020About Water Treatment Market for Aquaculture Aquaculture aims to ensure viable production of seafood for commercial use; it uses a host of techniques and technologies to raise aquatic plant and animal species. Apart from producing seafood, it also helps to restore the aquatic population and makes the habitat conducive for marine organisms. It enhances the proliferation of wild fish, which live und …
- パセリの世界市場2018-2022About this market Increasing demand for fresh herbs to drive market growth. Organic and fresh farming practices are gaining popularity across the world. As such, many parsley producers are shifting to organic farming practices. Technavio’ s analysts have predicted that the parsley market will register a CAGR of over 4% by 2023. Market Overview Growing focus on presentation and attractive plating W …
- シェールガス処理装置の世界市場:コンポーネント別(コンプレッサー&ポンプ、電気機械、熱交換器、内燃エンジン、測定および制御デバイス、その他)The global shale gas processing equipment market was valued at $4.5 billion in 2018, and is projected to reach $13.5 billion by 2026, growing at a CAGR of 14.8% from 2019 to 2026. Shale gas is a natural gas, trapped within shale formation deep inside the earth. It is drilled and extracted by breaking the shale formation, refined, processed, and transported for commercial purposes. Apart from proce …
- 細胞及び組織分析製品の世界市場:細胞・組織キャラクタリゼーション、生体試料作製、細胞・組織分離About Cell and Tissue Analysis Products Cell and tissue analysis refers to the study of cells or tissues to identify and analyze the structure and function of cells and tissues. Various biospecimen preparation, cell and tissue separation, and cell and tissue characterization products are used to isolate and assess cells and tissue. The predominant technologies used in cell and tissue analysis are …
- 世界における血液検査機器市場及び主要サプライヤー動向This 71-page report reviews current instrumentation technologies, and compares features of leading automated and semiautomated hemostasis diagnosticanalyzers.The report also presents strategic assessments of current and emerging suppliers of hemostasis diagnostic products, including marketing tactics, technological know-how, new products in R&D, collaborative arrangements and business strategi …
- 企業向け無線LANソリューションの世界市場:アクセスポイント、WLANコントローラ、ホットスポットゲートウェイThe report on the enterprise WLAN market focuses on various WLAN components, software solutions, services, verticals, and end users that are driving this market. NA, Europe, and APAC are the top three regions that hold the largest market share in the year 2014. The growth of mobile devices such as smartphones and tablets has fueled the demand for new wireless networking equipment that supports hig …
- ソース及びドレッシングの世界市場About Sauces and Dressings Sauces are usually used as a dip, a glaze, a filling, and an accompaniment with food. The most common types of sauces used by consumers worldwide are tomato sauce (ketchup), soy sauce, mustard sauce, chili sauce, béchamel sauce, and hollandaise sauce. Whereas dressings are used for garnishing and giving taste to food products, especially salads, burgers, sandwiches, and …
- 赤外線エミッタ(放射器)及び赤外線レシーバの世界市場The infrared emitter market is estimated to exhibit rapid growth potential till 2020. The total market for infrared emitter is expected to reach USD 867.1 Million by 2020, at a CAGR of 11.3% between 2015 and 2020. On the basis of industry verticals, the market has been segmented into automotive, consumer electronics, telecommunication, military & aerospace, industrial, healthcare, security & surve …
- マイクロディスプレイの世界市場2016-2020About the Microdisplay Market Microdisplays are microminiaturized displays having a screen size of less than 25 millimeters (screen size refers to the diagonal distance from one corner to the opposite corner of the screen). They are high-density screens with high resolution and are used in magnified display systems. Microdisplays are often used in conjunction with magnifying optics because of thei …
- パワーバンクの世界市場予測:容量別、USBポート単位別、インジケーター別、バッテリー種類別“Growing adoption of wearable devices is propelling the growth of the power bank market”The global power bank market size is expected to grow at a CAGR of 10.8% from 2019 to 2024, reaching USD 17.9 billion by 2024 from USD 9.5 billion in 2018. Most wearable devices are wireless and require power to operate at all times; batteries in these devices are not likely to last long with its increasing fun …
- 世界の天然黒鉛及び合成黒鉛市場2015The Global Natural & Synthetic Graphite Industry Report 2015 is a professional and in-depth study on the current state of the Natural & Synthetic Graphite industry. The report provides a basic overview of the industry including definitions, classifications, applications and industry chain structure. The Natural & Synthetic Graphite market analysis is provided for the international markets includin …
- 機内ブロードバンドの世界市場2016-2020About In-Flight BroadbandThe in-flight broadband market encompasses services that are employed to provide internet connectivity to airline and business jet passengers, as well as solutions that allow passengers to access digital media. The rapid growth in the bandwidth consumption with the use of mobile and other digital devices has also encouraged airlines to offer similar on-board connectivity s …
- イギリスの油圧マニホールド市場2016-2020About Hydraulic Manifold Hydraulic manifolds are essential components of all hydraulic machinery and equipment and are used across a wide range of end-user segments such as the aerospace, construction, agriculture, marine, material handling, oil and gas, railway, and subsea for flow control of fluids in hydraulic systems. However, this report covers hydraulic manifolds that are used in earthmoving …
- 染料・顔料の世界市場2016-2020About Dyes and Pigments Dyes and pigments are both coloring substances but differ from the other in terms of their solubility. While dyes are easily soluble in water and are absorbed by the material to which they are applied, pigments are insoluble in water and in most solvents. Pigments require mixing with a liquid binder or a carrying base that acts as a glue, and in which the pigment particles …
- 動力用鉛蓄電池の世界市場2018-2022About Motive Lead-Acid Battery The Lead-acid battery is the oldest secondary battery technology available in the global battery market, which is extensively used in numerous applications such as automotive, motive, stationary applications. It is majorly used owing to its cranking property, which provides the power with short span. Motive lead-acid battery refers to industrial lead-acid battery, wh …